Strumenti Utente

Strumenti Sito


mds:sds:start

Differenze

Queste sono le differenze tra la revisione selezionata e la versione attuale della pagina.

Link a questa pagina di confronto

Entrambe le parti precedenti la revisioneRevisione precedente
Prossima revisione
Revisione precedente
mds:sds:start [15/04/2026 alle 09:12 (2 mesi fa)] Salvatore Ruggierimds:sds:start [12/05/2026 alle 12:12 (6 settimane fa)] (versione attuale) Salvatore Ruggieri
Linea 68: Linea 68:
  
   * The project replaces the written part of the examination   * The project replaces the written part of the examination
-  * Project description and rules and Q&will be published here in April.+  * {{:mds:sds:sds.project.2026.pdf |Project description and rules and Q&A}}. 
 +  * [[http://131.114.72.230/sds/video/sds.project.2026.mp4|Recording of project description (.mp4)]] 
 + 
  
  
Linea 105: Linea 108:
 |23| 14/04 14-16 | Fib-C  | Statistical decision theory. | {{ :mds:sds:sdsln.pdf |}} Chpt. 4 {{:mds:sds:sds23.pdf|slides23 (.pdf)}}, {{:mds:sds:sds23.r|script23 (.R)}} | |23| 14/04 14-16 | Fib-C  | Statistical decision theory. | {{ :mds:sds:sdsln.pdf |}} Chpt. 4 {{:mds:sds:sds23.pdf|slides23 (.pdf)}}, {{:mds:sds:sds23.r|script23 (.R)}} |
 |24| 15/04 9-11 | Fib-C1  | Statistical decision theory (continued). |  | |24| 15/04 9-11 | Fib-C1  | Statistical decision theory (continued). |  |
-|25| 17/04 9-11 | Fib-C1 | Statistical decision theory (continued). Project presentation. |   |+|25| 17/04 9-11 | Fib-C1 | Project presentation. Confidence intervals. |   |
 |26| 21/04 14-16 | Fib-C | Confidence intervals: mean, proportion, linear regression. | **[T]** Chpts. 23.1,23.2,23.4,24.3,24.4 {{ :mds:sds:sdsln.pdf |}} Chpt. 3 {{:mds:sds:sds26.pdf|slides26 (.pdf)}}, {{:mds:sds:sds26.r|script26 (.R)}} | |26| 21/04 14-16 | Fib-C | Confidence intervals: mean, proportion, linear regression. | **[T]** Chpts. 23.1,23.2,23.4,24.3,24.4 {{ :mds:sds:sdsln.pdf |}} Chpt. 3 {{:mds:sds:sds26.pdf|slides26 (.pdf)}}, {{:mds:sds:sds26.r|script26 (.R)}} |
 |27| 22/04 9-11 | Fib-C1 | Confidence intervals (continued). Bootstrap and resampling methods. | **[T]** Chpts. 18.1-18.3,23.3 {{:mds:sds:sds27.pdf|slides27 (.pdf)}}, {{:mds:sds:sds27.r|script27 (.R)}} | |27| 22/04 9-11 | Fib-C1 | Confidence intervals (continued). Bootstrap and resampling methods. | **[T]** Chpts. 18.1-18.3,23.3 {{:mds:sds:sds27.pdf|slides27 (.pdf)}}, {{:mds:sds:sds27.r|script27 (.R)}} |
Linea 115: Linea 118:
 |35| 08/05 14-16 | Fib-C1 | Project Q&A.  |  | |35| 08/05 14-16 | Fib-C1 | Project Q&A.  |  |
 |33| 12/05 14-16 | Fib-C | Fitting distributions. Testing independence/association. | **[R]** Chpt. 8 {{ :mds:smd:ks.pdf | K-S}}, {{:mds:sds:sds33.pdf|slides33 (.pdf)}}, {{:mds:sds:sds33.r|script33 (.R)}} | |33| 12/05 14-16 | Fib-C | Fitting distributions. Testing independence/association. | **[R]** Chpt. 8 {{ :mds:smd:ks.pdf | K-S}}, {{:mds:sds:sds33.pdf|slides33 (.pdf)}}, {{:mds:sds:sds33.r|script33 (.R)}} |
-|34| 13/05 9-11 | Fib-C1 | Fitting distributions. Testing independence/association (continued).   |  |+|34| 13/05 9-11 | Fib-C1 | Fitting distributions. Testing independence/association (continued).  |  |
 |36| 15/05 9-11 | Fib-C1 | Project Q&A.  |  | |36| 15/05 9-11 | Fib-C1 | Project Q&A.  |  |
  
mds/sds/start.1776244344.txt.gz · Ultima modifica: 15/04/2026 alle 09:12 (2 mesi fa) da Salvatore Ruggieri

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki